As I watched this video I couldn't help noticing all the mistakes.
1) you fill the water reservoir with water (about 3 1/2 quarts)
2) with door open, select "Fill"
3) add instrument trays
4) close door after "Filling w/ water and "Loading"
5) set knob to "STE"
6) select amount of cycle time with timer (heat-up time plus exposure time)
7) at end of cycle "Vent" exhaust/ dry note: on a 273 cycle you need a good 15psi in chamber to vent all water out
8) with pressure at zero- crack door and set timer for "Dry Cycle"
Note; There is a lot of information on the internet. Not all of it is correct.
1) you fill the water reservoir with water (about 3 1/2 quarts)
2) with door open, select "Fill"
3) add instrument trays
4) close door after "Filling w/ water and "Loading"
5) set knob to "STE"
6) select amount of cycle time with timer (heat-up time plus exposure time)
7) at end of cycle "Vent" exhaust/ dry note: on a 273 cycle you need a good 15psi in chamber to vent all water out
8) with pressure at zero- crack door and set timer for "Dry Cycle"
Note; There is a lot of information on the internet. Not all of it is correct.